Enguri Hydro Power Plant Rehabilitation Project: Climate Resilience Upgrade

Təsvir
The EU is committed to support Georgia in its efforts to improve and modernise the energy sector.
The Enguri Hydropower Plant produces over a third of the electricity consumed in Georgia, but in the 1990s it was in a terrible state of disrepair. Following a series of long-term improvements, the project aims at increasing availability of non-polluting renewable energy in the country and improving operational safety of the Enguri power facility. It modernises further the infrastructure around the Enguri dam.
The project:
- Improves site access and safety issues through the rehabilitation of the access road;
- Improve safety and efficiency of the hydropower plant through electromechanical and civil rehabilitation works and sediment management;
- Introduces an effective mechanism for river basin coordination and best international practices for integrating climate resilience in hydropower operations, as well as to establish a blueprint for river basin management through the Enguri Hydrology Initiative;
The European Union supports this project with €7,010,000, which is used to finance rehabilitation of the access road, purchase of hydro-meteorological equipment to support the Enguri Hydrology Initiative and the Enguri reservoir sediment. An EBRD loan of €38 million finances rehabilitation works on the Enguri headrace tunnel, switchyard and river diversion gates, as well as the Vardnili II spillway gates; emergency repairs on the Enguri HPP penstocks; reservoir sediment management.
Konkret məqsədi
To make improvements to the Enguri Hydropower Plant to alleviate critical power shortage in Georgia at a low cost and to enhance the environmental benefits of the Enguri Hydro Power Plant facility.
Gözlənilən nəticələr
- Increased resilience of Enguri Hydropower Plant to climatic variability and climate change;
- Safe operation of the Hydropower plan at full capacity;
- Contribution to confidence-building between Georgia and the breakaway region of Abkhazia.
Beneficiaries
Engury Hydropower Plant
Layihə xəritəsi
Foto qalereya
Engury Hydropower Plant
PROJƏ ƏTRAFLI MƏLUMAT
Gürcüstan
Prioritet sahə:
Yaradan tərəfdaşlıq, Yaşıllaşdıran tərəfdaşlıq
Alt sektor:
Bağlantı (nəqliyyat və enerji), Ətraf mühit və iqlim dəyişikliyi
Mövzular:
Energetika, İnfrastruktur, Ətraf mühit
Layihə Vəziyyəti:
Tamamlandı
Başlama tarixi:
21.12.2018
Bitmə tarixi:
20.06.2023
Veb-sayt:
N/A
Sosial media:

AB Layihə nömrəsi:
403-314

Son xəbərlər və iştirak imkanlarında maraqlısınız?

Bu internet səhifəsi Aİ tərəfindən maliyyələşdirilən Şərq Qonşuluğu üzrə Regional Kommunikasiya Proqramı (“EU NEIGHBOURS east”) tərəfindən idarə olunur. O, Şərq Tərəfdaşlığı ölkələrində Avropa İttifaqının Nümayəndəliklərinin kommunikasiya fəaliyyətlərini tamamlayır və dəstəkləyir, o cümlədən Avropa Komissiyasının Genişlənmə Məsələləri və Şərq Qonşuluğu üzrə Baş Direktoratı (DG ENEST) və Avropa Xarici Fəaliyyət Xidmətinin rəhbərliyi altında fəaliyyət göstərir. "EU NEIGHBOURS east” proqramı "GOPA PACE" şirkətinin rəhbərlik etdiyi konsorsium tərəfindən icra olunur.


Bu məlumat Məsuliyyətdən imtina və Şəxsi məlumatların qorunmasına dair qaydalara tabedir. © European Union,